rbtfl.

air-power trade

관점별 · 1 시각 이번 호 전체

Air & Space Forces Magazine · United States · Sentinel ICBM, 81% over budget, still being restructured

Reports Northrop checking off restructure milestones, the Air Force aiming to finish restructuring by end-2026, first test launch by 2027 and IOC in the early 2030s, with the bulk of the overrun in newly-built silo and command infrastructure.

“The Air Force aims to finish restructuring Sentinel by end-2026, achieve a first test launch by 2027 and reach initial operational capability in the early 2030s.”