Hyperscalers plan US$725 billion in 2026 capex for GPU campuses, chip contracts, and power deals that determine who can train and serve frontier AI models.
AI data centres globally consume billions of gallons annually for server cooling, triggering water-rights conflicts across the US Southwest, Spain, and other drought-stressed regions.
完整档案 ›一家开发商起诉帝国灌溉区,要求每年约2.6亿加仑科罗拉多河水,成为数据中心用水诉讼、私打水井与庭外和解浪潮中的最新案例
市议会以沙漠水资源使用为由否决这处亚马逊关联综合体后,市方因违规用水吊销水表,亚利桑那州监管机构仍批准了两口项目水井
Meta的塔拉韦拉基地每年将取水约5.04亿升,多来自塔霍河;亚马逊在阿拉贡请求增水48%;干旱与AI建设相撞之际,莱里达禁止了数据中心